GS Energy Solutions

News

13/11/2024

GS Energy Solutions proudly presents; GMC Limited for offshore caisson replacements.

We at GS Energy Solutions are proud to announce our new collaboration with GMC Limited to provide innovative solutions to the Norwegian market! Together, we’re enhancing offshore platform performance through GMC’s advanced caisson replacement services.

GMC has an outstanding track record of repeatably replacing old caissons and installing new connected caissons and risers offshore within days. Their in-house expertise and reliable supply chain enable them to machine connectors and fabricate connected caisson spools in under 12 weeks. Moreover, their methods help prevent corrosion, prolong asset lifespan, and diminish future decommissioning expenses.

They have a proven track record of collaborating with operators and delivery partners to accomplish complete caisson replacement, from identifying defects to handing over the system, all within six months.

GMC Mechanical connector benefits:
No hot work necessary

Asset life extension

Reduced future decommissioning costs

Mitigate crevice corrosion with GMC’s patented preload sealing spacer

Customised designs configured to existing caisson geometry

Can be installed in confined spaces

Less POB compared to welding (~50% less people)

Quicker to install than a welded caisson– 98% time saving possible

If you’re looking to ensure maximum efficiency and longevity of your firewater, seawater lift or drain caissons, GMC’s track record speaks for itself. Let’s extend the life of your assets—quickly and safely. Get in touch for more info!”

We're always primed to help - from ready-made equipment to bespoke solutions.

Get in touch with GS Energy Solutions professionals today, and let us fix it, find it, figure it out on your behalf. Whatever you need, we're ready to respond.

chevron_right chevron_right
Find out more
Latest oil price